This route is repeated automatically on the control panel of the appropriate box as flashing indications covering the track circuits involved and the switchman obeys the instruction by setting up the required route.
Source: wiktionary
Ranked by relevance and common usage.
OpenGloss and ConceptNet supply richer edges like generalizations, collocations, and derivations.
4 translations across 4 languages.
1 total sentences available.
This route is repeated automatically on the control panel of the appropriate box as flashing indications covering the track circuits involved and the switchman obeys the instruction by setting up the required route.
Source: wiktionary
Data sourced from Wiktionary, WordNet, CMU, and other open linguistic databases. Updated March 2026.